50-427-755Sanitary Drains 2
Course Information
Description
This course provides the apprentice with the skills to identify, design, install and service various applications for storm water, clear water, and drainage systems. Apprentices will use the code language and tables to in various plumbing systems in accordance with the Wisconsin Plumbing Code. The course focuses on theory, work experience, and the application of plumbing code principles through discussions, drawing exercises, work sheets, and evaluations.
Total Credits
2

Course Competencies
  1. Identify the types of water discharge from a building site
    Assessment Strategies
    by completing research of Comm 82.38
    Criteria
    research of Comm 82.38 defines the waste type
    research of Comm 82.38 clarifies discharge points
    research of Comm 82.38 references table notes for clarification

  2. Size the stormwater/clearwater piping system
    Assessment Strategies
    by sizing stormwater/clearwater piping given a sample building and/or site
    Criteria
    conveyance piping is sized as per Comm 82.36
    conveyance piping is sized as per Comm 82.30

  3. Apply installation requirements for stormwater/clearwater piping
    Assessment Strategies
    by applying installation requirements for stormwater/clearwater piping to a sample building and/or site
    Criteria
    conveyance piping is sized as per Comm 82.36
    conveyance piping is sized as per Comm 82.30

  4. Determine the requirements for a site that is equal to or greater than one acre
    Assessment Strategies
    by developing an operation and maintenance plan as applicable
    by determining Comm 82.365 requirements for a site that is equal to or greater than one acre given a sample building and/or site
    Criteria
    you have determined when an operation and maintenance plan is required
    the operation and maintenance plan shall include at least the items listed in 82.36(13)
    you have determined when detention is required
    you have determined the setback distances
    you have determined the infiltration rate based on soil report/evaluation
    you have determined the infiltration rate correction factor
    you have determined acceptable soil separation based on soil texture