31410329Construction Techniques II
Course Information
Description
This course emphasizes interior finish including, but not necessarily limited to, installing wall board, hanging interior doors, installing interior trim, installing kitchen and bathroom cabinets, and completing a punch list.
Total Credits
5
Course Competencies
-
Install wall finishesAssessment StrategiesExam, Skill DemonstrationCriteriaFollow safety proceduresIdentify different types of drywall and their usesWall finish materials are measured and laid out according to project specifications with less than 1/8" varianceWall surfaces are prepared effectivelyMaterials are cut to precise dimensions, minimizing wasteInstallation technique for chosen wall finish ensures secure attachment and proper alignmentJoints and seams are treated effectively, achieving a smooth and seamless finishInspect completed wall finishes for quality and/or defectsDrywall is installed per manufacturer’s instructions and industry best practices
-
Finish drywallAssessment StrategiesExam, Skill DemonstrationCriteriaFollow safety proceduresDescribe the process of finishing drywallDrywall tape and joint (mud) compound is applied with minimal air pockets and wrinklesDried joint compound is sanded effectively to achieve a smooth, even surface with minimal visible seams or imperfectionsDrywall finish meets specified level as required by project specificationsCorner bead installation is effective and secure with straight and durable cornersPatches and repairs blend seamlessly with the surrounding areaDrywall is installed per manufacturer’s instructions and industry best practices
-
Install finish floorsAssessment StrategiesExam, Skill Demonstration - install tongue and groove flooringCriteriaFollow safety proceduresIdentify different types of flooringSubfloor surface preparation ensures a level and stable base for flooring installationFlooring materials are measured and laid out according to project specificationsMaterials are laid out minimizing wasteInstallation technique for chosen flooring material ensures proper expansion gaps and secure attachmentJoints and seams are treated effectively achieving a smooth and seamless finishTransition strips and moldings provide a professional finish between different flooring types or levelsFlooring is installed per manufacturer’s instructions and industry best practices
-
Install cabinetsAssessment StrategiesExam, Skill DemonstrationCriteriaFollow safety proceduresIdentify different types of cabinetsMeasure and lay out cabinet locations according to project specificationsCabinets are level and aligned, ensuring proper spacing and plumbnessCabinets are securely fastened to wall studs using most effective fasteners and techniquesCabinet hardware (such as handles, hinges) is installed effectively and securelyEvaluate operation of cabinet doors and drawersAdjust cabinet doors and drawers to ensure effective operation and alignmentCabinets are installed per manufacturer’s instructions and industry best practices
-
Install interior doorsAssessment StrategiesExam, Skill DemonstrationCriteriaFollow safety proceduresIdentify features of effective and ineffective interior door installationDoor frame is plumb, level, and square, with accurate clearancesDoor has accurate swing and alignmentDoor hardware (such as hinges, handles, locks) is installed effectively and securelyEvaluate door installation prior to final adjustmentsAdjust door hinges and hardware to ensure smooth operation and closingEvaluate clearances between door and frame prior to final adjustmentsDoors are installed per manufacturer’s instructions and industry best practices
-
Install interior trimAssessment StrategiesExam, Skill DemonstrationCriteriaFollow safety proceduresIdentify different interior trim components and parts (such as baseboard, casing, and crown molding)Trim materials to measured and cut to precise angles and lengthsInstallation technique for chosen trim type ensures secure attachment and alignmentJoints and seams are treated effectively achieving a smooth and seamless finishNail holes are effectively set and filled, blending seamlessly with the surrounding trimTrim joints are accurately coped and miteredInterior trim is installed per manufacturer’s instructions and industry best practices
-
Complete a punch listAssessment StrategiesWritten Document, Skill DemonstrationCriteriaEvaluate punch list for clarity, descriptions of each deficiency, deficiency location, and the required corrective actionPrioritize punch list items based on severity and impact on project completionOrganize punch list items logically for efficient tracking and completionVerify the completion of each punch list item or complete each itemDocument the corrective action takenClose out items within timeline specified by the instructorReassign items and document cause, if not completedUse forms or digital tools as specified by the instructor