31410310Materials and Estimating 2
Course Information
Description
This course builds on material and estimating skills learned in Materials and Estimating 1. Students will create estimates using Excel spreadsheets. In the capstone project, students will create a bid for building one of the student project homes. The bid will then be used as the basis of a sales presentation delivered to professionals from the home building industry.
Total Credits
1
Course Competencies
-
Analyze estimating in constructionAssessment StrategiesWritten ProductCriteriaIdentify cost estimates common to different construction projectsSelect an appropriate type estimate to meet job conditionsIdentify estimating job opportunitiesDifferentiate types of bids
-
Perform linear, volume and area calculationsAssessment StrategiesWritten ProductCriteriaUse scaled drawingsCalculations of the linear/area/volume are at least 90% accurateApply linear/area/volume calculations to scaled plan take-offMaterial take-off written products are accurate to 5% of actual quantities
-
Produce a hourly labor costAssessment StrategiesWritten ProductCriteriaUse found values for base pay, benefits, insurances and other costsCalculate a Burdened labor rateApply Burdened labor rate correctly to completed bid projectCompleted bid project includes correct labor calculation
-
Produce costs for overhead and profitAssessment StrategiesWritten ProductCriteriaCompleted bid project includes accurate overhead and profit calculations
-
Secure material costs from manufacturersAssessment StrategiesWritten ProductCriteriaIdentify construction materials in units that are commonly used in industryWritten product includes correctly labeled units of measure
-
Prepare material estimates for Completed Bid Final ProjectAssessment StrategiesBid proposal final projectCriteriaBid proposal is complete with material costsBid uses the Spreadsheet programBid proposal includes assigned labor costsBid proposal contains overhead costsBid proposal contains profit calculationsBid amount is accurately totaledBid contains the job name and dateBid proposal is titled with the contractor (your name)Include a contract and change order