10601304Industrial Fluid Distribution Systems
Course Information
Description
Covers installation and repair of fluidic systems. Includes fittings, thread cutting, pipe sweating, roll grooving, solder, plastic cementing, repair equipment and tools. Pumps, valves, water supply systems and fire protection distribution systems covered.
Total Credits
2
Course Competencies
-
Apply safety procedures, Lock-out Tag-out (LOTO)Assessment Strategieswritten objective testlab performanceCriteriadescribe basic shop safety rulesperform lockout/ tagout procedureschoose the correct personal protective equipment for given tasksidentify potential safety hazards that can be minimized by shop cleanlinessdescribe safe practices for lifting and transporting heavy objects
-
Select appropriate plumbing tools for plumbing tasksAssessment Strategieswritten objective testlab performanceCriteriachoose common tools utilized in industryexplain proper use of common tools utilized in industry
-
Apply mathematics for plumbing systemsAssessment Strategieswritten objective testlab performanceCriteriacalculate areacalculate volumecalculate weightapply math to determine pipe take up and fitting allowance for given pipe drawing
-
Identify appropriate piping material, fittings, and components for plumbing systemsAssessment Strategieswritten objective testlab performanceCriteriarecognize and name different grades and material used in piping and fittingsidentify plumbing distribution typesidentify different types of faucetsidentify different types of valvesidentify different types of meterscompare advantages of various plumbing systemscompare disadvantages of various plumbing systems
-
Sweat and join copperAssessment Strategieswritten objective testlab performanceCriteriademonstrate lead free 95/5 pipe sweatingdemonstrate a swagedemonstrate a flaredemonstrate a compressionwork passes a leak testsolder must be evenly distributed - no globbing
-
Cut and fit schedule 10 - 40 pipeAssessment Strategieswritten objective testlab performanceCriteriademonstrate pipe assembly to specificationdemonstrate proper use of nipple makerdemonstrate 4" drop head cuttingmeasurements are within tolerancedemonstrate proper sealant application
-
Design plumbing systemsAssessment Strategieswritten objective testlab performanceCriteriaapply various tables for determining adequate size of drainage and water supply pipingexplain the relationship of height to water pressure - static and dynamiccompare and contrast sprinkler systemsdisassemble, repair, and reassemble pumpscompare and contrast water heatersutilize various leveling instrumentsinterpret plumbing symbols and abbreviations used in architectural drawings
-
Connect soil pipeAssessment Strategieswritten objective testlab performanceCriteriause proper fittingsdemonstrate proper application techniquedemonstrate transition from cast to plasticexplain how to join hub and spigot cast
-
Apply plastic potable fluidic systemsAssessment Strategieswritten objective testlab performanceCriteriaidentify at least 4 ways to connect plastic pipe fittingsdemonstrate work passes a leak testdemonstrate lab project is in toleranceassemble PVC to industry standardsassemble PEX to industry standardsassemble PE to industry standards