10462304Industrial Fluid Distribution Systems
Course Information
Description
Covers installation and repair of fluidic systems. Includes fittings, thread cutting, pipe sweating, roll grooving, solder, plastic cementing, repair equipment and tools. Pumps, valves, water supply systems and fire protection distribution systems covered.
Total Credits
2
Prior Learning Assessment
  • Experiential-Portfolio

Course Competencies
  1. Apply safety procedures, Lock-out Tag-out (LOTO)
    Assessment Strategies
    written objective test
    lab performance
    Criteria
    describe basic shop safety rules
    perform lockout/ tagout procedures
    choose the correct personal protective equipment for given tasks
    identify potential safety hazards that can be minimized by shop cleanliness
    describe safe practices for lifting and transporting heavy objects

  2. Select appropriate plumbing tools for plumbing tasks
    Assessment Strategies
    written objective test
    lab performance
    Criteria
    choose common tools utilized in industry
    explain proper use of common tools utilized in industry

  3. Apply mathematics for plumbing systems
    Assessment Strategies
    written objective test
    lab performance
    Criteria
    calculate area
    calculate volume
    calculate weight
    apply math to determine pipe take up and fitting allowance for given pipe drawing

  4. Identify appropriate piping material, fittings, and components for plumbing systems
    Assessment Strategies
    written objective test
    lab performance
    Criteria
    recognize and name different grades and material used in piping and fittings
    identify plumbing distribution types
    identify different types of faucets
    identify different types of valves
    identify different types of meters
    compare advantages of various plumbing systems
    compare disadvantages of various plumbing systems

  5. Sweat and join copper
    Assessment Strategies
    written objective test
    lab performance
    Criteria
    demonstrate lead free 95/5 pipe sweating
    demonstrate a swage
    demonstrate a flare
    demonstrate a compression
    work passes a leak test
    solder must be evenly distributed - no globbing

  6. Cut and fit schedule 10 - 40 pipe
    Assessment Strategies
    written objective test
    lab performance
    Criteria
    demonstrate pipe assembly to specification
    demonstrate proper use of nipple maker
    demonstrate 4" drop head cutting
    measurements are within tolerance
    demonstrate proper sealant application

  7. Design plumbing systems
    Assessment Strategies
    written objective test
    lab performance
    Criteria
    apply various tables for determining adequate size of drainage and water supply piping
    explain the relationship of height to water pressure - static and dynamic
    compare and contrast sprinkler systems
    disassemble, repair, and reassemble pumps
    compare and contrast water heaters
    utilize various leveling instruments
    interpret plumbing symbols and abbreviations used in architectural drawings

  8. Connect soil pipe
    Assessment Strategies
    written objective test
    lab performance
    Criteria
    use proper fittings
    demonstrate proper application technique
    demonstrate transition from cast to plastic
    explain how to join hub and spigot cast

  9. Apply plastic potable fluidic systems
    Assessment Strategies
    written objective test
    lab performance
    Criteria
    identify at least 4 ways to connect plastic pipe fittings
    demonstrate work passes a leak test
    demonstrate lab project is in tolerance
    assemble PVC to industry standards
    assemble PEX to industry standards
    assemble PE to industry standards